The roofing system was designed by Imper Roof Ltd in consultation
with the Archirtect's Department of Argyll & District Council Argyll
House Alexandra Parade DUNOON.
Roof Specification
Vapour Control Layer
Torchbond one layer IMPER Paralon 77 3 mm. underlay to existing primed
metal decking.
Insulation "U" value 0.45
IMPER TORCHTHANE insulation board comprising 40mm. P.U.R/15mm. Perlite
factory laminate board. Boards to be staggered and bonded in IMPER PU
adhesive to Vapour Control Layer. Mechanically fix to existing deck at
perimeters.
Drainage Board
Bond 45 mm. IMPER TORCHTHANE 30 mm. PUR/15mm Perlite drainage board 300
mm. wide along gutter areas.
Underlayer
Torcha bond one layer IMPER Paralon 77 3mm. underlay to insulation board.
(110mm. side laps. 150mm. end laps)
Cap Sheet
Torch bond one layer IMPER Paralon ARD/HS PLUS Mineral
Surface Cap Sheet to underlay. (100mm. side laps, 150 mm. end laps)
The above roofing contract was carried out by an IMPER approved
contractor, and is supported by a 20 year guarantee on materials and workmanship.