The roofing system was designed by Imper Roof ltd in consultation
with MacConvilles
Roof Specification
Primer
Apply one coat IMPER Primer to existing deck.
Vapour Control Layer
Torchbond one layer IMPER Paralon Vaporbar 1 to primed
deck.
Insulation
IMPER 100mm. PUR pre-bitumised insulation board.
Boards to be staggered and bonded in hot bitumentype 115/15 to Vapour
Control Layer.
Underlay
Torch bond one layer IMPER Paralon 77 3 mm. underlay
to Vapour Escape Sheet. (100mm. side Laps, 150mm. end laps)
Cap Sheet
Torch bond one layer IMPER Paralon ARD/HS PLUS Mineral
Surface Cap Sheet to underlay. (100mm. side laps, 150mm. end laps)
The above roofing contract was carried out by MITIE Roofing
(South East) Ltd, and is supported by a 15 year guarantee on materials
and workmanship.